Project Description

Hammersmith – Averill Street, W6

Works carried: July – Sept 2014

  • Removal of old kitchen units
  • Disconnection of old plumbing system
  • New electrics
  • Installation of new fuse-board
  • New plumbing
  • New combi boiler and installation
  • Refurbishment of bathroom: laying tiles, installation of equipment
  • Installation of kitchen units and appliances
  • Installation of new windows
  • Re-location of back bedroom door
  • Building build-in cupboards
  • Building shelves unit in the middle bedroom
  • Building shelves in a part of hall/landing
  • Installation of wood flooring
  • Decoration of the flat
  • Installation of new skirting materials included
  • Removing old fireplace closure/blockade (middle bedroom) and building shelves
  • Installation of loft hatch
  • Rearrangement o of new loft:installation of insulation, partial walls, light, flooring, decoration
  • Insulation installation in loft back room
  • Fixing damp problem in the entrance lobby
  • Re-decoration of entrance lobby