Project Description

Fulham – Ashcombe Street

Works carried: May 2012 – June 2012

  • Refurbishment of an existing garage space
  • Building a toilet room at the garage level
  • Extending the building upwards: building an additional room on the top floor
  • Waterproofing garage walls – applying damp proof mortal / plaster
  • Re-pointing existing brick walls
  • Installation of round metal stairs connecting the ground floor level with the top floor
  • Construction of a gavle roof on the garage extension
  • Installation of gutters and downpipes
  • Installation of circular gavle windows and velux roof windows
  • Installation od insulation in the top floor room
  • Installation of electrics in the top room
  • Adjusting the existing electric system to the extended electric circuit
  • Decoration of the new interior